IAC logo
IAC Assessment: GT0670
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0670
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product carpet
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 180,000
Annual Production 22,820 Thousand Feet
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,922 3,092,028 kWh $0.03
Electricity Demand $166,298 11,143 kW-months/year $14.92
Electricity Fees $10,221 - $ -
Natural Gas $50,096 14,252 MMBtu $3.52
TOTAL ENERGY COSTS $306,925
RECOMMENDED SAVINGS* $150,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92,204
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$512
Cost:
-
- - - - - - - - $512 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$512
-
$
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$36,226
Cost:
-
- - - - - - - - $36,226 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$36,226
-
$
-
-
$
-
-
$
03: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$370
Cost:
-
- - - - - - - - $370 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$370
-
$
-
-
$
-
-
$
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$3,388
Cost:
$750
- - - - - - $3,388 979 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,388
979
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$30,991
Cost:
$5,250
$905 36,049 $28,332 1,900 $1,754 - - - - - - - - - $905
36,049
kWh
$28,332
1,900
kW-months/year
$1,754
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,078
Cost:
$15,000
$4,685 185,815 $4,887 332 $506 - - - - - - - - - $4,685
185,815
kWh
$4,887
332
kW-months/year
$506
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,869
Cost:
$28,628
$2,477 98,183 $4,937 330 $455 - - - - - - - - - $2,477
98,183
kWh
$4,937
330
kW-months/year
$455
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,397
Cost:
$64,899
$3,719 147,714 $4,203 286 $475 - - - - - - - - - $3,719
147,714
kWh
$4,203
286
kW-months/year
$475
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$6,000
Cost:
$4,000
- - - - - - - - - - $6,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$6,000
-
$
-
-
$
10: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$46,957
Cost:
-
$11,843 469,812 - - $711 - $10,778 3,115 - - - - $23,625 - $11,843
469,812
kWh
-
-
kW-months/year
$711
-
$
$10,778
3,115
MMBtu
-
-
$
-
-
$
$23,625
-
$
TOTAL RECOMMENDED Savings:
$150,788
Cost:
$118,527
$23,629 937,573 $42,359 2,848 $3,901 - $14,166 4,094 $37,108 - $6,000 - $23,625 - $23,629
937,573
kWh
$42,359
2,848
kW-months/year
$3,901
-
$
$14,166
4,094
MMBtu
$37,108
-
$
$6,000
-
$
$23,625
-
$
TOTAL IMPLEMENTED Savings:
$92,204
Cost:
$89,149
$9,309 369,578 $37,422 2,518 $2,735 - - - $36,738 - $6,000 - - - $9,309
369,578
kWh
$37,422
2,518
kW-months/year
$2,735
-
$
-
-
MMBtu
$36,738
-
$
$6,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Primary Product