IAC logo
IAC Assessment: GT0672
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0672
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Aggregate Stone
NAICS n/a
SIC 3281 - Cut Stone And Stone Products
Sales $10,000,000-$50,000,000
# of Employees 21
Plant Area (Sq.Ft.) 27,000,000
Annual Production 1,200,000 Tons
Production Hrs. Annual 3,600
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,273 2,208,382 kWh $0.05
Electricity Demand $73,496 9,187 kW-months/year $8.00
Electricity Fees $10,546 - $ -
Fuel Oil #2 $245,000 49,000 MMBtu $5.00
TOTAL ENERGY COSTS $463,315
RECOMMENDED SAVINGS* $58,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,181
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.5123 REDUCE FLUID FLOW RATES Savings:
$4,090
Cost:
$600
$4,090 127,784 - - - - - - - - $4,090
127,784
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$9,897
Cost:
$5,660
$3,809 118,992 $6,088 458 - - - - - - $3,809
118,992
kWh
$6,088
458
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$6,500
Cost:
$5,000
- - - - - - $6,500 1,300 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,500
1,300
gal
-
-
$
04: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$1,950
Cost:
$3,500
- - - - $1,950 364 - - - - -
-
kWh
-
-
kW-months/year
$1,950
364
MMBtu
-
-
gal
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,071
Cost:
$51,281
$1,230 36,928 $1,841 137 - - - - - - $1,230
36,928
kWh
$1,841
137
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$32,520
Cost:
-
- - - - - - - - $32,520 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$32,520
-
$
TOTAL RECOMMENDED Savings:
$58,028
Cost:
$66,041
$9,129 283,704 $7,929 595 $1,950 364 $6,500 1,300 $32,520 - $9,129
283,704
kWh
$7,929
595
kW-months/year
$1,950
364
MMBtu
$6,500
1,300
gal
$32,520
-
$
TOTAL IMPLEMENTED Savings:
$46,181
Cost:
$56,881
$5,320 164,712 $1,841 137 - - $6,500 1,300 $32,520 - $5,320
164,712
kWh
$1,841
137
kW-months/year
-
-
MMBtu
$6,500
1,300
gal
$32,520
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Administrative Changes