IAC logo
IAC Assessment: GT0681
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0681
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Extruded Aluminum
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 120,000
Annual Production 14,400,000 Pounds
Production Hrs. Annual 4,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,730 5,034,291 kWh $0.01
Electricity Demand $193,542 1,901 kW-months/year $101.81
Electricity Fees $39,937 - $ -
Natural Gas $154,319 40,696 MMBtu $3.79
LPG $9,653 1,380 MMBtu $6.99
TOTAL ENERGY COSTS $492,660
RECOMMENDED SAVINGS* $227,463 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,917
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ lb $ $ $ $ $ $ $ $
01: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$10,162
Cost:
-
- - - - - - - - - - - - - - - - $10,162 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$10,162
-
$
-
-
$
-
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$45,788
Cost:
-
- - - - - - $48,488 13,176 - - - - - - $(-2,700) - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$48,488
13,176
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$(-2,700)
-
$
-
-
$
-
-
$
-
-
$
03: 3.5142 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS Savings:
$6,800
Cost:
-
- - - - - - - - - - $12,200 8,330 - - $(-5,400) - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$12,200
8,330
gal
-
-
lb
$(-5,400)
-
$
-
-
$
-
-
$
-
-
$
04: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER Savings:
$1,667
Cost:
$600
- - - - - - - - $1,667 720,000 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,667
720,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$12,917
Cost:
$4,800
- - - - - - - - - - $12,917 8,330 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$12,917
8,330
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$8,596
Cost:
$2,360
- - - - - - $8,596 2,268 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,596
2,268
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,970
Cost:
$1,950
$1,970 72,098 - - - - - - - - - - - - - - - - - - - - $1,970
72,098
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,540
Cost:
$6,700
- - - - - - - - - - - - $5,540 264,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$5,540
264,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
09: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$1,024
Cost:
$3,500
- - - - - - - - - - - - - - - - - - $1,024 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
$1,024
-
$
-
-
$
10: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$125,800
Cost:
$64,000
- - - - - - - - - - - - - - - - - - - - $125,800 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
$125,800
-
$
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,431
Cost:
$57,365
$1,563 64,771 $2,868 173 - - - - - - - - - - - - - - - - - - $1,563
64,771
kWh
$2,868
173
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,768
Cost:
$6,225
$903 35,170 $1,710 108 $155 - - - - - - - - - - - - - - - - - $903
35,170
kWh
$1,710
108
kW-months/year
$155
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$227,463
Cost:
$147,500
$4,436 172,039 $4,578 281 $155 - $57,084 15,444 $1,667 720,000 $25,117 16,660 $5,540 264,000 $(-8,100) - $10,162 - $1,024 - $125,800 - $4,436
172,039
kWh
$4,578
281
kW-months/year
$155
-
$
$57,084
15,444
MMBtu
$1,667
720,000
Tgal
$25,117
16,660
gal
$5,540
264,000
lb
$(-8,100)
-
$
$10,162
-
$
$1,024
-
$
$125,800
-
$
TOTAL IMPLEMENTED Savings:
$12,917
Cost:
$4,800
- - - - - - - - - - $12,917 8,330 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$12,917
8,330
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product