IAC logo
IAC Assessment: GT0693
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0693
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Lawnmowers
NAICS n/a
SIC 3524 - Lawn And Garden Equipment
Sales $100,000,000-$500,000,000
# of Employees 800
Plant Area (Sq.Ft.) 180,000
Annual Production 150,000 Pieces
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,139 12,758,793 kWh $0.03
Electricity Demand $357,370 32,937 kW-months/year $10.85
Electricity Fees $50,085 - $ -
Natural Gas $191,073 61,063 MMBtu $3.13
TOTAL ENERGY COSTS $1,005,783
RECOMMENDED SAVINGS* $359,777 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,142
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$96,627
Cost:
-
- - $91,157 7,294 $5,470 - - - - - - - -
-
kWh
$91,157
7,294
kW-months/year
$5,470
-
$
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$39,400
Cost:
$152,830
$16,020 667,644 $21,150 176 $2,230 - - - - - - - $16,020
667,644
kWh
$21,150
176
kW-months/year
$2,230
-
$
-
-
lb
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,416
Cost:
$63,200
$3,060 120,164 $3,950 30 $406 - - - - - - - $3,060
120,164
kWh
$3,950
30
kW-months/year
$406
-
$
-
-
lb
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$12,800
Cost:
-
$5,254 218,933 $6,796 55 $750 - - - - - - - $5,254
218,933
kWh
$6,796
55
kW-months/year
$750
-
$
-
-
lb
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$26,280
Cost:
$64,000
$6,903 287,515 $17,890 144 $1,487 - - - - - - - $6,903
287,515
kWh
$17,890
144
kW-months/year
$1,487
-
$
-
-
lb
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,972
Cost:
$1,050
$2,902 120,750 $1,788 14 $282 - - - - - - - $2,902
120,750
kWh
$1,788
14
kW-months/year
$282
-
$
-
-
lb
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$97,512
Cost:
-
- - - - - - - - - - $97,512 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$97,512
-
$
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$14,770
Cost:
$1,250
- - - - - - $14,770 39,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,770
39,000
lb
-
-
$
-
-
$
09: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$60,000
Cost:
$120,000
- - - - - - - - $60,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$60,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$359,777
Cost:
$402,330
$34,139 1,415,006 $142,731 7,713 $10,625 - $14,770 39,000 $60,000 - $97,512 - $34,139
1,415,006
kWh
$142,731
7,713
kW-months/year
$10,625
-
$
$14,770
39,000
lb
$60,000
-
$
$97,512
-
$
TOTAL IMPLEMENTED Savings:
$59,142
Cost:
$155,130
$18,922 788,394 $22,938 190 $2,512 - $14,770 39,000 - - - - $18,922
788,394
kWh
$22,938
190
kW-months/year
$2,512
-
$
$14,770
39,000
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes