IAC logo
IAC Assessment: GT0700
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0700
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Wood Processing
NAICS n/a
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 46
Plant Area (Sq.Ft.) 100,000
Annual Production 25,000 Thousand Feet
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,971 1,014,068 kWh $0.04
Electricity Demand $36,456 3,255 kW-months/year $11.20
Electricity Fees $5,710 - $ -
Natural Gas $101,146 26,877 MMBtu $3.76
TOTAL ENERGY COSTS $187,775
RECOMMENDED SAVINGS* $260,767 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,806
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ %
01: 2.8112 COMBINE UTILITY METERS Savings:
$2,238
Cost:
$5,018
- - - - $2,238 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,238
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$193
Cost:
$330
- - - - $193 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$193
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$170
Cost:
-
- - - - - - $170 204 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$170
204
MMBtu
-
-
lb
-
-
$
-
-
%
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$715
Cost:
$2,240
$330 8,206 $280 25 $105 - - - - - - - - - $330
8,206
kWh
$280
25
kW-months/year
$105
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$530
Cost:
$675
$230 5,862 $246 22 $54 - - - - - - - - - $230
5,862
kWh
$246
22
kW-months/year
$54
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,105
Cost:
$4,013
$401 9,965 $627 56 $77 - - - - - - - - - $401
9,965
kWh
$627
56
kW-months/year
$77
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,576
Cost:
$15,200
$1,566 38,687 $840 75 $170 - - - - - - - - - $1,566
38,687
kWh
$840
75
kW-months/year
$170
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
08: 3.4155 METER WASTE WATER Savings:
$2,620
Cost:
$500
- - - - - - - - - - $2,620 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$2,620
-
$
-
-
%
09: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$620
Cost:
$2,490
- - - - - - - - $210 12,000 $410 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$210
12,000
lb
$410
-
$
-
-
%
10: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$250,000
Cost:
$180,000
- - - - - - - - - - - - $250,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$250,000
-
%
TOTAL RECOMMENDED Savings:
$260,767
Cost:
$210,466
$2,527 62,720 $1,993 178 $2,837 - $170 204 $210 12,000 $3,030 - $250,000 - $2,527
62,720
kWh
$1,993
178
kW-months/year
$2,837
-
$
$170
204
MMBtu
$210
12,000
lb
$3,030
-
$
$250,000
-
%
TOTAL IMPLEMENTED Savings:
$7,806
Cost:
$24,443
$2,297 56,858 $1,747 156 $352 - $170 204 $210 12,000 $3,030 - - - $2,297
56,858
kWh
$1,747
156
kW-months/year
$352
-
$
$170
204
MMBtu
$210
12,000
lb
$3,030
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production