IAC logo
IAC Assessment: GT0708
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0708
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Print Fabrics
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 100,000
Annual Production 9,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,487 3,029,160 kWh $0.05
Electricity Demand $79,762 13,033 kW-months/year $6.12
Electricity Fees $19,175 - $ -
Natural Gas $480,739 99,272 MMBtu $4.84
TOTAL ENERGY COSTS $924,654
RECOMMENDED SAVINGS* $208,329 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,562
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
01: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION Savings:
$7,140
Cost:
-
- - - - - - $7,140 1,608 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,140
1,608
MMBtu
-
-
$
-
-
Tgal
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,765
Cost:
-
- - - - - - $6,265 1,411 $(-1,500) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,265
1,411
MMBtu
$(-1,500)
-
$
-
-
Tgal
03: 2.8112 COMBINE UTILITY METERS Savings:
$11,677
Cost:
$1,000
- - - - $11,677 - - - - - - - -
-
kWh
-
-
kW-months/year
$11,677
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$38,843
Cost:
$13,500
- - - - - - $38,843 4,522 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$38,843
4,522
MMBtu
-
-
$
-
-
Tgal
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$132,090
Cost:
$60,000
- - - - - - $132,090 29,750 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$132,090
29,750
MMBtu
-
-
$
-
-
Tgal
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$9,164
Cost:
$10,500
- - - - - - $8,905 1,505 - - $259 - -
-
kWh
-
-
kW-months/year
-
-
$
$8,905
1,505
MMBtu
-
-
$
$259
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,650
Cost:
$21,400
$3,528 69,168 $813 133 $309 - - - - - - - $3,528
69,168
kWh
$813
133
kW-months/year
$309
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$208,329
Cost:
$106,400
$3,528 69,168 $813 133 $11,986 - $193,243 38,796 $(-1,500) - $259 - $3,528
69,168
kWh
$813
133
kW-months/year
$11,986
-
$
$193,243
38,796
MMBtu
$(-1,500)
-
$
$259
-
Tgal
TOTAL IMPLEMENTED Savings:
$64,562
Cost:
$45,400
$3,528 69,168 $813 133 $309 - $61,153 9,046 $(-1,500) - $259 - $3,528
69,168
kWh
$813
133
kW-months/year
$309
-
$
$61,153
9,046
MMBtu
$(-1,500)
-
$
$259
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Water Consumption