IAC Assessment: GT0710
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0710
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Polymer Colorants
NAICS n/a
SIC 2816 - Inorganic Pigments
Sales $10,000,000-$50,000,000
# of Employees 32
Plant Area (Sq.Ft.) 50,000
Annual Production 3,360,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,904 1,424,546 kWh $0.02
Electricity Demand $51,868 4,077 kW-months/year $12.72
Electricity Fees $655 - $ -
Natural Gas $7,374 1,023 MMBtu $7.21
LPG $878 158 MMBtu $5.56
TOTAL ENERGY COSTS $94,679
RECOMMENDED SAVINGS* $164,933 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $161,705
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Primary Product Electricity Usage Electricity Demand Electricity Fees LPG Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,085
Cost:
$300
$966 40,570 $992 78 $127 - - - - - $966
40,570
kWh
$992
78
kW-months/year
$127
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,305
Cost:
$4,030
$511 21,481 $1,641 129 $153 - - - - - $511
21,481
kWh
$1,641
129
kW-months/year
$153
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$865
Cost:
$2,450
$400 16,800 $407 32 $58 - - - - - $400
16,800
kWh
$407
32
kW-months/year
$58
-
$
-
-
MMBtu
-
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,125
Cost:
$3,600
$1,123 47,200 - - $2 - - - - - $1,123
47,200
kWh
-
-
kW-months/year
$2
-
$
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,120
Cost:
$6,932
$517 21,722 $529 42 $74 - - - - - $517
21,722
kWh
$529
42
kW-months/year
$74
-
$
-
-
MMBtu
-
-
$
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$423
Cost:
$2,100
$(-105) (-4,400) $(-320) (-25) $(-30) - $878 158 - - $(-105)
(-4,400)
kWh
$(-320)
(-25)
kW-months/year
$(-30)
-
$
$878
158
MMBtu
-
-
$
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$156,450
Cost:
$5,200
- - - - - - - - $156,450 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$156,450
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$560
Cost:
$275
$214 8,996 $312 25 $34 - - - - - $214
8,996
kWh
$312
25
kW-months/year
$34
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$164,933
Cost:
$24,887
$3,626 152,369 $3,561 281 $418 - $878 158 $156,450 - $3,626
152,369
kWh
$3,561
281
kW-months/year
$418
-
$
$878
158
MMBtu
$156,450
-
$
TOTAL IMPLEMENTED Savings:
$161,705
Cost:
$11,980
$1,877 78,851 $3,040 239 $338 - - - $156,450 - $1,877
78,851
kWh
$3,040
239
kW-months/year
$338
-
$
-
-
MMBtu
$156,450
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees LPG Primary Product Electricity Usage Electricity Demand Electricity Fees LPG Primary Product