Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2001 |
Principal Product | PET Fiber |
NAICS | n/a |
SIC | 2299 - Textile Goods, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 521,000 |
Annual Production | 176,000,000 Pounds |
Production Hrs. Annual | 8,600 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,432,109 | 48,233,743 | kWh | $0.05 |
Natural Gas | $1,850,924 | 343,641 | MMBtu | $5.39 |
TOTAL ENERGY COSTS | $4,433,033 | |||
RECOMMENDED SAVINGS* | $1,699,268 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $50,880 Cost: $75,000 |
- | - | $50,880 | 9,638 | - | - |
- - kWh |
$50,880 9,638 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $45,320 Cost: $55,800 |
- | - | $45,320 | 13,170 | - | - |
- - kWh |
$45,320 13,170 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $17,930 Cost: $14,400 |
$17,930 | 512,263 | - | - | - | - |
$17,930 512,263 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $10,878 Cost: $5,050 |
$10,878 | 310,800 | - | - | - | - |
$10,878 310,800 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT |
Savings: $1,166,246 Cost: $1,875,000 |
- | - | $1,041,246 | 200,000 | $125,000 | 10,000,000 |
- - kWh |
$1,041,246 200,000 MMBtu |
$125,000 10,000,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $152,112 Cost: $51,570 |
- | - | $152,112 | 28,974 | - | - |
- - kWh |
$152,112 28,974 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $101,860 Cost: $27,240 |
- | - | $101,860 | 19,402 | - | - |
- - kWh |
$101,860 19,402 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1112 HEAT OIL TO PROPER TEMPERATURE FOR GOOD ATOMIZATION |
Savings: $154,042 Cost: $7,500 |
- | - | $154,042 | 28,579 | - | - |
- - kWh |
$154,042 28,579 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,699,268 Cost: $2,111,560 |
$28,808 | 823,063 | $1,545,460 | 299,763 | $125,000 | 10,000,000 | $28,808 823,063 kWh |
$1,545,460 299,763 MMBtu |
$125,000 10,000,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) |