IAC Assessment: GT0712
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0712
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product PET Fiber
NAICS n/a
SIC 2299 - Textile Goods, Nec
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 521,000
Annual Production 176,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,432,109 48,233,743 kWh $0.05
Natural Gas $1,850,924 343,641 MMBtu $5.39
TOTAL ENERGY COSTS $4,433,033
RECOMMENDED SAVINGS* $1,699,268 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$50,880
Cost:
$75,000
- - $50,880 9,638 - - -
-
kWh
$50,880
9,638
MMBtu
-
-
lb
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$45,320
Cost:
$55,800
- - $45,320 13,170 - - -
-
kWh
$45,320
13,170
MMBtu
-
-
lb
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$17,930
Cost:
$14,400
$17,930 512,263 - - - - $17,930
512,263
kWh
-
-
MMBtu
-
-
lb
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,878
Cost:
$5,050
$10,878 310,800 - - - - $10,878
310,800
kWh
-
-
MMBtu
-
-
lb
05: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT Savings:
$1,166,246
Cost:
$1,875,000
- - $1,041,246 200,000 $125,000 10,000,000 -
-
kWh
$1,041,246
200,000
MMBtu
$125,000
10,000,000
lb
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$152,112
Cost:
$51,570
- - $152,112 28,974 - - -
-
kWh
$152,112
28,974
MMBtu
-
-
lb
07: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$101,860
Cost:
$27,240
- - $101,860 19,402 - - -
-
kWh
$101,860
19,402
MMBtu
-
-
lb
08: 2.1112 HEAT OIL TO PROPER TEMPERATURE FOR GOOD ATOMIZATION Savings:
$154,042
Cost:
$7,500
- - $154,042 28,579 - - -
-
kWh
$154,042
28,579
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$1,699,268
Cost:
$2,111,560
$28,808 823,063 $1,545,460 299,763 $125,000 10,000,000 $28,808
823,063
kWh
$1,545,460
299,763
MMBtu
$125,000
10,000,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)