Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2002 |
Principal Product | Mining, Aggregate, Cement |
NAICS | n/a |
SIC | 3315 - Steel Wire And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 211 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 41,255 Units |
Production Hrs. Annual | 6,420 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,566,373 | 61,071,551 | kWh | $0.04 |
Natural Gas | $958,759 | 168,354 | MMBtu | $5.69 |
TOTAL ENERGY COSTS | $3,583,953 | |||
RECOMMENDED SAVINGS* | $963,696 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $563,200 Cost: $312,500 |
- | - | - | - | - | - | $563,200 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$563,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $74,140 Cost: $270,000 |
- | - | $74,140 | 10,561 | - | - | - | - |
- - kWh |
$74,140 10,561 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS |
Savings: $71,787 Cost: $13,892 |
- | - | $71,787 | 10,226 | - | - | - | - |
- - kWh |
$71,787 10,226 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,990 Cost: $1,450 |
$1,990 | 49,630 | - | - | - | - | - | - |
$1,990 49,630 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $60 Cost: $70 |
$60 | 1,494 | - | - | - | - | - | - |
$60 1,494 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,537 Cost: $10,872 |
$4,537 | 113,416 | - | - | - | - | - | - |
$4,537 113,416 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $693 Cost: $1,198 |
$693 | 17,313 | - | - | - | - | - | - |
$693 17,313 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $12,137 Cost: $162,293 |
$12,137 | 303,434 | - | - | - | - | - | - |
$12,137 303,434 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $235,152 Cost: $156,000 |
$(-10,042) | (-251,053) | $245,700 | 35,000 | $(-506) | (-1,200,000) | - | - |
$(-10,042) (-251,053) kWh |
$245,700 35,000 MMBtu |
$(-506) (-1,200,000) Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $963,696 Cost: $928,275 |
$9,375 | 234,234 | $391,627 | 55,787 | $(-506) | (-1,200,000) | $563,200 | - | $9,375 234,234 kWh |
$391,627 55,787 MMBtu |
$(-506) (-1,200,000) Tgal |
$563,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Administrative Changes |