Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2002 |
Principal Product | Commercial Carpet |
NAICS | n/a |
SIC | 2273 - Carpets And Rugs |
Sales | $100,000,000-$500,000,000 |
# of Employees | 800 |
Plant Area (Sq.Ft.) | 825,000 |
Annual Production | 126,000 Thousand Feet |
Production Hrs. Annual | 4,160 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,353,664 | 30,494,639 | kWh | $0.04 |
Natural Gas | $1,744,261 | 260,113 | MMBtu | $6.71 |
Fuel Oil #2 | $23,666 | 3,204 | MMBtu | $7.39 |
TOTAL ENERGY COSTS | $3,121,591 | |||
RECOMMENDED SAVINGS* | $202,617 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,131 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $5,075 Cost: - |
- | - | $4,788 | 1,370 | - | - | $287 | - | - | - | - | - |
- - kWh |
$4,788 1,370 MMBtu |
- - lb |
$287 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $4,563 Cost: - |
- | - | $4,305 | 1,230 | - | - | $258 | - | - | - | - | - |
- - kWh |
$4,305 1,230 MMBtu |
- - lb |
$258 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2311 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS |
Savings: $3,094 Cost: - |
- | - | $2,919 | 834 | - | - | $175 | - | - | - | - | - |
- - kWh |
$2,919 834 MMBtu |
- - lb |
$175 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8112 COMBINE UTILITY METERS |
Savings: $5,560 Cost: - |
- | - | - | - | - | - | $5,560 | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$5,560 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,538 Cost: - |
$3,338 | 46,449 | - | - | - | - | $200 | - | - | - | - | - |
$3,338 46,449 kWh |
- - MMBtu |
- - lb |
$200 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $140 Cost: $330 |
$140 | 358 | - | - | - | - | - | - | - | - | - | - |
$140 358 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $12,802 Cost: $1,500 |
- | - | $12,063 | 3,521 | - | - | $739 | - | - | - | - | - |
- - kWh |
$12,063 3,521 MMBtu |
- - lb |
$739 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY |
Savings: $3,265 Cost: $2,500 |
- | - | $3,080 | 880 | - | - | $185 | - | - | - | - | - |
- - kWh |
$3,080 880 MMBtu |
- - lb |
$185 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,091 Cost: $3,500 |
$2,916 | 64,804 | - | - | - | - | $175 | - | - | - | - | - |
$2,916 64,804 kWh |
- - MMBtu |
- - lb |
$175 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS |
Savings: $29,536 Cost: $16,300 |
- | - | $27,864 | 7,960 | - | - | $1,672 | - | - | - | - | - |
- - kWh |
$27,864 7,960 MMBtu |
- - lb |
$1,672 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2514 COVER OPEN TANKS |
Savings: $31,387 Cost: $36,639 |
- | - | $29,610 | 8,460 | - | - | $1,777 | - | - | - | - | - |
- - kWh |
$29,610 8,460 MMBtu |
- - lb |
$1,777 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.5191 MODIFY DYE BECK |
Savings: $22,904 Cost: $73,150 |
- | - | $21,154 | 6,044 | - | - | $1,269 | - | $320 | - | $161 | - |
- - kWh |
$21,154 6,044 MMBtu |
- - lb |
$1,269 - $ |
$320 - $ |
$161 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $77,662 Cost: $80,000 |
- | - | - | - | $2,906 | - | - | - | $74,756 | - | - | - |
- - kWh |
- - MMBtu |
$2,906 - lb |
- - $ |
$74,756 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $202,617 Cost: $213,919 |
$6,394 | 111,611 | $105,783 | 30,299 | $2,906 | - | $12,297 | - | $75,076 | - | $161 | - | $6,394 111,611 kWh |
$105,783 30,299 MMBtu |
$2,906 - lb |
$12,297 - $ |
$75,076 - $ |
$161 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,131 Cost: $6,330 |
$3,056 | 65,162 | $7,868 | 2,250 | - | - | $6,207 | - | - | - | - | - | $3,056 65,162 kWh |
$7,868 2,250 MMBtu |
- - lb |
$6,207 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Water Consumption |