IAC logo
IAC Assessment: GT0732
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0732
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2002
Principal Product Tire Cord
NAICS n/a
SIC 2296 - Tire Cord And Fabrics
Sales $10,000,000-$50,000,000
# of Employees 248
Plant Area (Sq.Ft.) 1,200,000
Annual Production 9,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,884,973 30,130,129 kWh $0.06
Natural Gas $790,490 150,550 MMBtu $5.25
LPG $79,863 5,798 MMBtu $13.77
TOTAL ENERGY COSTS $2,755,326
RECOMMENDED SAVINGS* $649,819 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $354,391
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$167,930
Cost:
$432,000
$63,000 2,099,941 $95,424 1,400 $9,506 - - - - - $63,000
2,099,941
kWh
$95,424
1,400
kW-months/year
$9,506
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$48,475
Cost:
$135,000
$27,198 877,491 $19,645 195 - - - - $1,632 - $27,198
877,491
kWh
$19,645
195
kW-months/year
-
-
$
-
-
MMBtu
$1,632
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$30,879
Cost:
$7,800
$17,480 531,946 $13,399 133 - - - - - - $17,480
531,946
kWh
$13,399
133
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$12,008
Cost:
$2,600
$6,386 206,038 $5,239 52 - - - - $383 - $6,386
206,038
kWh
$5,239
52
kW-months/year
-
-
$
-
-
MMBtu
$383
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$342,383
Cost:
-
- - - - - - - - $342,383 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$342,383
-
$
06: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$4,560
Cost:
-
- - - - - - $4,560 868 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,560
868
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,020
Cost:
$27,376
- - - - - - $13,020 2,480 - - -
-
kWh
-
-
kW-months/year
-
-
$
$13,020
2,480
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,053
Cost:
$7,000
$2,053 43,376 - - - - - - - - $2,053
43,376
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$28,511
Cost:
$117,000
$16,120 490,621 $12,391 123 - - - - - - $16,120
490,621
kWh
$12,391
123
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$649,819
Cost:
$728,776
$132,237 4,249,413 $146,098 1,903 $9,506 - $17,580 3,348 $344,398 - $132,237
4,249,413
kWh
$146,098
1,903
kW-months/year
$9,506
-
$
$17,580
3,348
MMBtu
$344,398
-
$
TOTAL IMPLEMENTED Savings:
$354,391
Cost:
$2,600
$6,386 206,038 $5,239 52 - - - - $342,766 - $6,386
206,038
kWh
$5,239
52
kW-months/year
-
-
$
-
-
MMBtu
$342,766
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes