IAC Assessment: GT0746
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0746
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2003
Principal Product CHEMICALS
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 68
Plant Area (Sq.Ft.) 100,000
Annual Production 37,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $543,162 21,150,519 kWh $0.03
Electricity Demand $376,587 33,995 kW-months/year $11.08
Electricity Fees $88,169 - $ -
Natural Gas $2,039,892 578,515 MMBtu $3.53
TOTAL ENERGY COSTS $3,047,810
RECOMMENDED SAVINGS* $53,593 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Water Consumption
$ kWh $ kW-months/year $ $ $ gal $ Tgal
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$11,932
Cost:
$44,000
$6,132 219,240 $4,243 418 - - $519 519,000 $1,038 - $6,132
219,240
kWh
$4,243
418
kW-months/year
-
-
$
$519
519,000
gal
$1,038
-
Tgal
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,422
Cost:
-
- - - - $3,422 - - - - - -
-
kWh
-
-
kW-months/year
$3,422
-
$
-
-
gal
-
-
Tgal
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$12,113
Cost:
$28,000
$7,662 273,312 $4,451 438 - - - - - - $7,662
273,312
kWh
$4,451
438
kW-months/year
-
-
$
-
-
gal
-
-
Tgal
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,727
Cost:
$2,500
$1,958 68,890 $1,769 110 - - - - - - $1,958
68,890
kWh
$1,769
110
kW-months/year
-
-
$
-
-
gal
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$593
Cost:
-
$367 13,140 $226 18 - - - - - - $367
13,140
kWh
$226
18
kW-months/year
-
-
$
-
-
gal
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,357
Cost:
$20,000
$11,418 408,240 $1,939 191 - - - - - - $11,418
408,240
kWh
$1,939
191
kW-months/year
-
-
$
-
-
gal
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,222
Cost:
$14,500
$7,612 272,160 $610 60 - - - - - - $7,612
272,160
kWh
$610
60
kW-months/year
-
-
$
-
-
gal
-
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$227
Cost:
$150
$227 10,512 - - - - - - - - $227
10,512
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$53,593
Cost:
$109,150
$35,376 1,265,494 $13,238 1,235 $3,422 - $519 519,000 $1,038 - $35,376
1,265,494
kWh
$13,238
1,235
kW-months/year
$3,422
-
$
$519
519,000
gal
$1,038
-
Tgal
TOTAL IMPLEMENTED Savings:
$4,320
Cost:
$2,500
$2,325 82,030 $1,995 128 - - - - - - $2,325
82,030
kWh
$1,995
128
kW-months/year
-
-
$
-
-
gal
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal $ Tgal
Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Water Consumption