IAC logo
IAC Assessment: GT0755
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0755
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2003
Principal Product LUMBER
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 332,500
Annual Production 100,000,000 Units
Production Hrs. Annual 2,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $645,463 13,578,108 kWh $0.05
Electricity Demand $34,328 1,739 kW-months/year $19.74
Natural Gas $1,948 179 MMBtu $10.88
TOTAL ENERGY COSTS $681,739
RECOMMENDED SAVINGS* $138,634 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $480
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$930
Cost:
-
$930 30,250 - - $930
30,250
kWh
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,800
Cost:
$4,500
$6,800 218,000 - - $6,800
218,000
kWh
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$4,100
Cost:
$1,500
$(-25) (-800) $4,125 - $(-25)
(-800)
kWh
$4,125
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,464
Cost:
$20,971
$6,464 210,269 - - $6,464
210,269
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,366
Cost:
$7,491
$2,366 76,965 - - $2,366
76,965
kWh
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,359
Cost:
$5,565
$1,359 44,196 - - $1,359
44,196
kWh
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$16,327
Cost:
$8,458
$16,327 531,137 - - $16,327
531,137
kWh
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,950
Cost:
$71,400
$45,950 1,494,878 - - $45,950
1,494,878
kWh
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$38,766
Cost:
$17,133
$38,766 229,871 - - $38,766
229,871
kWh
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$15,092
Cost:
$50,185
$15,092 164,094 - - $15,092
164,094
kWh
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$480
Cost:
$650
$480 15,555 - - $480
15,555
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$138,634
Cost:
$187,853
$134,509 3,014,415 $4,125 - $134,509
3,014,415
kWh
$4,125
-
$
TOTAL IMPLEMENTED Savings:
$480
Cost:
$650
$480 15,555 - - $480
15,555
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes