IAC Assessment: GT0758
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0758
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2003
Principal Product DECORATIVE PAPER
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2754 - Commercial Printing, Gravure
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 200,000
Annual Production 196,850 Thousand Feet
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $590,434 11,063,308 kWh $0.05
Natural Gas $363,464 88,715 MMBtu $4.10
Fuel Oil #2 $9,560 1,177 MMBtu $8.12
TOTAL ENERGY COSTS $992,302
RECOMMENDED SAVINGS* $105,026 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,534
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,720
Cost:
$47,268
$20,720 388,020 - - - - - - $20,720
388,020
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$9,072
Cost:
$12,000
$9,072 73,742 - - - - - - $9,072
73,742
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,895
Cost:
$47,736
$1,895 35,496 - - - - - - $1,895
35,496
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$14,438
Cost:
$31,350
$14,438 401,600 - - - - - - $14,438
401,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$322
Cost:
-
- - $322 185 - - - - -
-
kWh
$322
185
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$28,386
Cost:
$12,140
$28,386 789,557 - - - - - - $28,386
789,557
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,773
Cost:
$6,150
- - - - $6,773 1,652 - - -
-
kWh
-
-
kW-months/year
$6,773
1,652
MMBtu
-
-
Tgal
08: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$23,420
Cost:
$1,850
- - - - - - $23,420 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$23,420
-
Tgal
TOTAL RECOMMENDED Savings:
$105,026
Cost:
$158,494
$74,511 1,688,415 $322 185 $6,773 1,652 $23,420 - $74,511
1,688,415
kWh
$322
185
kW-months/year
$6,773
1,652
MMBtu
$23,420
-
Tgal
TOTAL IMPLEMENTED Savings:
$53,534
Cost:
$61,118
$29,792 461,762 $322 185 - - $23,420 - $29,792
461,762
kWh
$322
185
kW-months/year
-
-
MMBtu
$23,420
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal