Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2003 |
Principal Product | IRON PIPE |
NAICS | 331511 - Iron Foundries |
SIC | 3321 - Gray And Ductile Iron Foundries |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 360,000 |
Annual Production | 210,000 Tons |
Production Hrs. Annual | 5,000 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,467,296 | 29,506,297 | kWh | $0.05 |
Natural Gas | $2,012,095 | 556,670 | MMBtu | $3.61 |
Fuel Oil #2 | $84,692 | 1,869 | MMBtu | $45.31 |
Other Energy | $3,656,430 | 653,892 | MMBtu | $5.59 |
TOTAL ENERGY COSTS | $7,220,513 | |||
RECOMMENDED SAVINGS* | $1,552,145 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $135,215 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Water Consumption | Electricity Usage | Natural Gas | Other Energy | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER |
Savings: $5,870 Cost: $3,000 |
$5,870 | 118,089 | - | - | - | - | - | - |
$5,870 118,089 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $770,950 Cost: $340,200 |
- | - | - | - | $760,000 | 136,260 | $10,950 | - |
- - kWh |
- - MMBtu |
$760,000 136,260 MMBtu |
$10,950 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $33,765 Cost: $188,200 |
$33,765 | 679,367 | - | - | - | - | - | - |
$33,765 679,367 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $200,910 Cost: $20,900 |
$200,910 | 3,700,000 | - | - | - | - | - | - |
$200,910 3,700,000 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $157,690 Cost: $210,000 |
$157,690 | 160,524 | - | - | - | - | - | - |
$157,690 160,524 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $287,380 Cost: $24,500 |
- | - | $287,380 | 79,607 | - | - | - | - |
- - kWh |
$287,380 79,607 MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $5,960 Cost: $2,190 |
- | - | $5,960 | 1,650 | - | - | - | - |
- - kWh |
$5,960 1,650 MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $89,620 Cost: $108,930 |
- | - | $89,620 | 24,825 | - | - | - | - |
- - kWh |
$89,620 24,825 MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,552,145 Cost: $897,920 |
$398,235 | 4,657,980 | $382,960 | 106,082 | $760,000 | 136,260 | $10,950 | - | $398,235 4,657,980 kWh |
$382,960 106,082 MMBtu |
$760,000 136,260 MMBtu |
$10,950 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $135,215 Cost: $302,320 |
$39,635 | 797,456 | $95,580 | 26,475 | - | - | - | - | $39,635 797,456 kWh |
$95,580 26,475 MMBtu |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Water Consumption | Electricity Usage | Natural Gas | Other Energy | Water Consumption |