IAC Assessment: GT0774
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0774
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2003
Principal Product METAL FINISHING
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 64,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,955 4,171,597 kWh $0.05
Natural Gas $157,806 30,862 MMBtu $5.11
TOTAL ENERGY COSTS $409,766
RECOMMENDED SAVINGS* $45,742 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,371
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$8,200
Cost:
-
- - - - $8,200 - - - - - -
-
kWh
-
-
kW-months/year
$8,200
-
$
-
-
MMBtu
-
-
Tgal
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,135
Cost:
$2,700
$1,135 42,419 - - - - - - - - $1,135
42,419
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$7,977
Cost:
$2,500
- - - - - - $5,752 1,127 $2,225 - -
-
kWh
-
-
kW-months/year
-
-
$
$5,752
1,127
MMBtu
$2,225
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$164
Cost:
$300
$164 6,132 - 8 - - - - - - $164
6,132
kWh
-
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$904
Cost:
$1,549
$904 33,781 - 55 - - - - - - $904
33,781
kWh
-
55
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$290
Cost:
$200
$290 11,023 - - - - - - - - $290
11,023
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$27,072
Cost:
$3,660
$25,753 962,724 $1,319 - - - - - - - $25,753
962,724
kWh
$1,319
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$45,742
Cost:
$10,909
$28,246 1,056,079 $1,319 63 $8,200 - $5,752 1,127 $2,225 - $28,246
1,056,079
kWh
$1,319
63
kW-months/year
$8,200
-
$
$5,752
1,127
MMBtu
$2,225
-
Tgal
TOTAL IMPLEMENTED Savings:
$17,371
Cost:
$4,249
$1,194 44,804 - 55 $8,200 - $5,752 1,127 $2,225 - $1,194
44,804
kWh
-
55
kW-months/year
$8,200
-
$
$5,752
1,127
MMBtu
$2,225
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption