IAC Assessment: GT0776
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0776
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product CARPET YARN
NAICS 313110 - Fiber, Yarn, and Thread Mills
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 310
Plant Area (Sq.Ft.) 247,321
Annual Production 29,750 Thousand Feet
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,408,507 32,341,037 kWh $0.04
Natural Gas $361,839 71,272 MMBtu $5.08
TOTAL ENERGY COSTS $1,799,249
RECOMMENDED SAVINGS* $160,924 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Ancillary Material Cost Water Consumption
$ kWh $ MMBtu $ $ $ Tgal
01: 2.1111 CONTROL PRESSURE ON STEAMER OPERATIONS Savings:
$1,335
Cost:
-
- - $1,335 263 - - - - -
-
kWh
$1,335
263
MMBtu
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,581
Cost:
$550
$1,581 36,271 - - - - - - $1,581
36,271
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$330
Cost:
$83
- - $330 65 - - - - -
-
kWh
$330
65
MMBtu
-
-
$
-
-
Tgal
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$14,283
Cost:
-
$14,283 327,600 - - - - - - $14,283
327,600
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,980
Cost:
$13,020
$11,980 274,775 - - - - - - $11,980
274,775
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$649
Cost:
$530
$649 14,874 - - - - - - $649
14,874
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$51,823
Cost:
$73,750
$51,823 1,188,600 - - - - - - $51,823
1,188,600
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
08: 3.4141 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE Savings:
$37,139
Cost:
$76,240
$12,561 288,101 - - $15,435 - $9,143 - $12,561
288,101
kWh
-
-
MMBtu
$15,435
-
$
$9,143
-
Tgal
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,188
Cost:
$32,362
$14,188 325,412 - - - - - - $14,188
325,412
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
10: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$9,120
Cost:
$16,200
- - $9,120 1,796 - - - - -
-
kWh
$9,120
1,796
MMBtu
-
-
$
-
-
Tgal
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$18,496
Cost:
$100,000
- - $18,496 3,643 - - - - -
-
kWh
$18,496
3,643
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$160,924
Cost:
$312,735
$107,065 2,455,633 $29,281 5,767 $15,435 - $9,143 - $107,065
2,455,633
kWh
$29,281
5,767
MMBtu
$15,435
-
$
$9,143
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ $ $ Tgal
Electricity Usage Natural Gas Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Ancillary Material Cost Water Consumption