IAC logo
IAC Assessment: GT0781
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0781
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product PLASTIC PLUMBING FITTINGS
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 176,000
Annual Production 40,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $811,167 19,349,123 kWh $0.04
Natural Gas $75 - MMBtu -
TOTAL ENERGY COSTS $811,242
RECOMMENDED SAVINGS* $169,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,915
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$77
Cost:
-
- - - - $77 - -
-
kWh
-
-
kW-months/year
$77
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$580
Cost:
$450
- - $580 414 - - -
-
kWh
$580
414
kW-months/year
-
-
$
03: 2.7122 DISCONNECT BALLASTS Savings:
$4,110
Cost:
$2,750
$2,647 90,500 $1,463 122 - - $2,647
90,500
kWh
$1,463
122
kW-months/year
-
-
$
04: 2.5117 CONVERT TO INDIRECT TEMPERATURE CONTROL SYSTEM Savings:
$53,600
Cost:
$66,000
$33,295 1,110,000 $20,305 1,692 - - $33,295
1,110,000
kWh
$20,305
1,692
kW-months/year
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$740
Cost:
$1,000
$740 24,620 - - - - $740
24,620
kWh
-
-
kW-months/year
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$9,700
Cost:
$14,600
$9,700 321,960 - - - - $9,700
321,960
kWh
-
-
kW-months/year
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$98,900
Cost:
$253,400
$64,359 2,146,000 $34,541 3,024 - - $64,359
2,146,000
kWh
$34,541
3,024
kW-months/year
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,408
Cost:
$7,300
$527 17,564 $881 77 - - $527
17,564
kWh
$881
77
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$169,115
Cost:
$345,500
$111,268 3,710,644 $57,770 5,329 $77 - $111,268
3,710,644
kWh
$57,770
5,329
kW-months/year
$77
-
$
TOTAL IMPLEMENTED Savings:
$6,915
Cost:
$11,500
$3,914 132,684 $2,924 613 $77 - $3,914
132,684
kWh
$2,924
613
kW-months/year
$77
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes