IAC logo
IAC Assessment: GT0782
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0782
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product FLEXIBLE PACKAGING ROLL STOCK
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 70,000
Annual Production 13,000,000 Pounds
Production Hrs. Annual 6,336
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $232,792 3,731,365 kWh $0.06
Natural Gas $53,577 6,808 MMBtu $7.87
TOTAL ENERGY COSTS $286,369
RECOMMENDED SAVINGS* $28,725 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,055
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$7,120
Cost:
$5,800
$7,120 244,123 - - $7,120
244,123
kWh
-
-
MMBtu
02: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$9,340
Cost:
$2,000
$(-521) (-17,844) $9,861 1,253 $(-521)
(-17,844)
kWh
$9,861
1,253
MMBtu
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$7,210
Cost:
$3,000
$(-31,942) (-1,093,493) $39,152 4,975 $(-31,942)
(-1,093,493)
kWh
$39,152
4,975
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,280
Cost:
$2,145
$1,280 43,864 - - $1,280
43,864
kWh
-
-
MMBtu
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,625
Cost:
$200
$1,625 55,478 $1,000 127 $1,625
55,478
kWh
$1,000
127
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$540
Cost:
$450
$540 18,344 - - $540
18,344
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$610
Cost:
$2,340
$610 20,985 - - $610
20,985
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,725
Cost:
$15,935
$(-21,288) (-728,543) $50,013 6,355 $(-21,288)
(-728,543)
kWh
$50,013
6,355
MMBtu
TOTAL IMPLEMENTED Savings:
$5,055
Cost:
$5,135
$4,055 138,671 $1,000 127 $4,055
138,671
kWh
$1,000
127
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas