Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product PACKAGING FOOD
NAICS 311821 - Cookie and Cracker Manufacturing
SIC 2052 - Cookies And Crackers
Sales $100,000,000-$500,000,000
# of Employees 230
Plant Area (Sq.Ft.) 225,000
Annual Production 14,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,292 3,737,355 kWh $0.02
Electricity Demand $119,377 8,283 kW-months/year $14.41
Electricity Fees $20,283 - $ -
Natural Gas $24,747 2,043 MMBtu $12.11
TOTAL ENERGY COSTS $255,699
RECOMMENDED SAVINGS* $45,327 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,287
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,100
Cost:
-
- - - - $12,100 - - - - - -
-
kWh
-
-
kW-months/year
$12,100
-
$
-
-
MMBtu
-
-
Tgal
02: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$4,460
Cost:
-
- - $4,460 290 - - - - - - -
-
kWh
$4,460
290
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,870
Cost:
-
$1,870 62,400 - - - - - - - - $1,870
62,400
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,757
Cost:
$1,200
$1,619 54,000 $1,138 74 - - - - - - $1,619
54,000
kWh
$1,138
74
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,570
Cost:
$2,240
$323 10,634 - - - - $4,247 515 - - $323
10,634
kWh
-
-
kW-months/year
-
-
$
$4,247
515
MMBtu
-
-
Tgal
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$223
Cost:
$150
$223 7,410 - - - - - - - - $223
7,410
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 3.4155 METER WASTE WATER Savings:
$1,900
Cost:
$2,500
- - - - - - - - $1,900 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,900
-
Tgal
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,360
Cost:
$2,500
$1,360 45,400 - - - - - - - - $1,360
45,400
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,630
Cost:
$3,030
$1,630 54,500 - - - - - - - - $1,630
54,500
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
10: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$5,400
Cost:
$8,400
$5,400 179,900 - - - - - - - - $5,400
179,900
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,057
Cost:
$4,250
$5,319 177,300 $3,738 243 - - - - - - $5,319
177,300
kWh
$3,738
243
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$45,327
Cost:
$24,270
$17,744 591,544 $9,336 607 $12,100 - $4,247 515 $1,900 - $17,744
591,544
kWh
$9,336
607
kW-months/year
$12,100
-
$
$4,247
515
MMBtu
$1,900
-
Tgal
TOTAL IMPLEMENTED Savings:
$12,287
Cost:
$6,750
$8,549 285,100 $3,738 243 - - - - - - $8,549
285,100
kWh
$3,738
243
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal