IAC logo
IAC Assessment: GT0786
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0786
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product PLASTIC CRATES
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 90,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $672,907 25,108,808 kWh $0.03
Electricity Demand $421,448 34,944 kW-months/year $12.06
Electricity Fees $65,829 - $ -
Natural Gas $9,007 666 MMBtu $13.52
TOTAL ENERGY COSTS $1,169,191
RECOMMENDED SAVINGS* $266,660 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $149,190
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ $
01: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$121,900
Cost:
$45,000
- - - - $121,900 48,000 - - -
-
kWh
-
-
kW-months/year
$121,900
48,000
gal
-
-
$
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$33,950
Cost:
$38,000
$33,950 918,750 - - - - - - $33,950
918,750
kWh
-
-
kW-months/year
-
-
gal
-
-
$
03: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$33,280
Cost:
$25,000
$21,850 591,360 $11,430 845 - - - - $21,850
591,360
kWh
$11,430
845
kW-months/year
-
-
gal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,700
Cost:
$22,500
$27,700 750,000 - - - - - - $27,700
750,000
kWh
-
-
kW-months/year
-
-
gal
-
-
$
05: 2.2615 CLEAN CONDENSER TUBES Savings:
$22,690
Cost:
$3,000
$14,900 403,200 $7,790 576 - - - - $14,900
403,200
kWh
$7,790
576
kW-months/year
-
-
gal
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$19,500
Cost:
-
- - $19,500 1,440 - - - - -
-
kWh
$19,500
1,440
kW-months/year
-
-
gal
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,600
Cost:
$35
- - - - - - $4,600 - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,600
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,040
Cost:
$3,737
$2,000 54,096 $1,040 77 - - - - $2,000
54,096
kWh
$1,040
77
kW-months/year
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$266,660
Cost:
$137,272
$100,400 2,717,406 $39,760 2,938 $121,900 48,000 $4,600 - $100,400
2,717,406
kWh
$39,760
2,938
kW-months/year
$121,900
48,000
gal
$4,600
-
$
TOTAL IMPLEMENTED Savings:
$149,190
Cost:
$48,035
$14,900 403,200 $7,790 576 $121,900 48,000 $4,600 - $14,900
403,200
kWh
$7,790
576
kW-months/year
$121,900
48,000
gal
$4,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes