IAC Assessment: GT0802
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2005
Principal Product Filters
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 96
Plant Area (Sq.Ft.) 78,654
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,900
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,345 1,735,360 kWh $0.05
Electricity Demand $52,693 6,139 kW-months/year $8.58
Electricity Fees $201 - $ -
Natural Gas $73,248 10,663 MMBtu $6.87
TOTAL ENERGY COSTS $208,487
RECOMMENDED SAVINGS* $28,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,810
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$220
Cost:
$300
$220 7,240 - - - - - - $220
7,240
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$18,100
Cost:
$10,800
$(-13,100) (-432,000) - - $30,900 4,500 $300 - $(-13,100)
(-432,000)
kWh
-
-
kW-months/year
$30,900
4,500
MMBtu
$300
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,610
Cost:
$2,800
$2,610 85,700 - - - - - - $2,610
85,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,610
Cost:
$6,510
$1,310 43,200 $1,300 88 - - - - $1,310
43,200
kWh
$1,300
88
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,820
Cost:
$60
- - - - $1,820 265 - - -
-
kWh
-
-
kW-months/year
$1,820
265
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,100
Cost:
-
$1,100 36,200 - - - - - - $1,100
36,200
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,780
Cost:
$5,000
$815 26,800 $965 66 - - - - $815
26,800
kWh
$965
66
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$28,240
Cost:
$25,470
$(-7,045) (-232,860) $2,265 154 $32,720 4,765 $300 - $(-7,045)
(-232,860)
kWh
$2,265
154
kW-months/year
$32,720
4,765
MMBtu
$300
-
$
TOTAL IMPLEMENTED Savings:
$23,810
Cost:
$22,610
$(-9,655) (-318,560) $2,265 154 $30,900 4,500 $300 - $(-9,655)
(-318,560)
kWh
$2,265
154
kW-months/year
$30,900
4,500
MMBtu
$300
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes