IAC Assessment: GT0805
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0805
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2005
Principal Product Fiberglass Bathtubs
NAICS 326191 - Plastics Plumbing Fixture Manufacturing
SIC 3088 - Plastics Plumbing Fixtures
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 109,065
Annual Production 32,700 Pieces
Production Hrs. Annual 2,080
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,975 861,120 kWh $0.04
Electricity Demand $40,267 49,109 kW-months/year $0.82
Electricity Fees $6,195 - $ -
Natural Gas $106,034 11,937 MMBtu $8.88
TOTAL ENERGY COSTS $183,471
RECOMMENDED SAVINGS* $119,330 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$310
Cost:
$253
$67 2,190 $39 3 - - - - - - $204 - $67
2,190
kWh
$39
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$204
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,451
Cost:
$3,470
$425 13,800 $1,026 80 - - - - - - - - $425
13,800
kWh
$1,026
80
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,375
Cost:
$5,705
$649 21,076 $1,726 134 - - - - - - - - $649
21,076
kWh
$1,726
134
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$1,400
Cost:
$700
$410 13,321 $990 77 - - - - - - - - $410
13,321
kWh
$990
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.8112 COMBINE UTILITY METERS Savings:
$4,682
Cost:
$7,000
- - - - - - - - $4,682 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,682
-
$
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$23,800
Cost:
-
- - - - - - $23,800 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$23,800
-
$
-
-
$
-
-
$
07: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$11,117
Cost:
$10,000
$3,265 106,000 $7,852 610 - - - - - - - - $3,265
106,000
kWh
$7,852
610
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.5194 REDESIGN PROCESS Savings:
$74,195
Cost:
$46,000
$(-2,464) (-80,000) $(-15,456) (-1,200) $92,115 10,350 - - - - - - $(-2,464)
(-80,000)
kWh
$(-15,456)
(-1,200)
kW-months/year
$92,115
10,350
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$119,330
Cost:
$73,128
$2,352 76,387 $(-3,823) (-296) $92,115 10,350 $23,800 - $4,682 - $204 - $2,352
76,387
kWh
$(-3,823)
(-296)
kW-months/year
$92,115
10,350
MMBtu
$23,800
-
$
$4,682
-
$
$204
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost