IAC logo
IAC Assessment: GT0809
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0809
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2005
Principal Product Air Conditioners
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 700,000
Annual Production 250,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,022,787 18,440,471 kWh $0.06
Natural Gas $506,970 69,910 MMBtu $7.25
TOTAL ENERGY COSTS $1,529,757
RECOMMENDED SAVINGS* $141,169 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,884
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$15,771
Cost:
-
$15,771 406,477 - - - - - - $15,771
406,477
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,490
Cost:
-
$7,490 193,100 - - - - - - $7,490
193,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$36,600
Cost:
$10,000
$36,600 942,000 - - - - - - $36,600
942,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,513
Cost:
$1,475
$2,513 64,770 - - - - - - $2,513
64,770
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,160
Cost:
$2,180
$3,160 81,500 - - - - - - $3,160
81,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$8,596
Cost:
-
- - - - $11,746 1,620 $(-3,150) - -
-
kWh
-
-
kW-months/year
$11,746
1,620
MMBtu
$(-3,150)
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,741
Cost:
$10,484
$4,906 174,000 $3,835 348 - - - - $4,906
174,000
kWh
$3,835
348
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$305
Cost:
$700
$305 7,827 - - - - - - $305
7,827
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,388
Cost:
$35,680
$6,504 230,655 $4,884 468 - - - - $6,504
230,655
kWh
$4,884
468
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,948
Cost:
$39,765
$7,417 263,010 $5,531 528 - - - - $7,417
263,010
kWh
$5,531
528
kW-months/year
-
-
MMBtu
-
-
$
11: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,500
Cost:
$35,000
$10,500 270,725 - - - - - - $10,500
270,725
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,157
Cost:
$102,196
$13,265 470,400 $9,892 936 - - - - $13,265
470,400
kWh
$9,892
936
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$141,169
Cost:
$237,480
$108,431 3,104,464 $24,142 2,280 $11,746 1,620 $(-3,150) - $108,431
3,104,464
kWh
$24,142
2,280
kW-months/year
$11,746
1,620
MMBtu
$(-3,150)
-
$
TOTAL IMPLEMENTED Savings:
$54,884
Cost:
$11,475
$54,884 1,413,247 - - - - - - $54,884
1,413,247
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes