IAC Assessment: GT0814
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0814
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2005
Principal Product Tire Cord
NAICS 314994 - Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills
SIC 2296 - Tire Cord And Fabrics
Sales $10,000,000-$50,000,000
# of Employees 172
Plant Area (Sq.Ft.) 1,400,000
Annual Production 10,700,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,241,254 18,707,376 kWh $0.07
Natural Gas $581,508 92,771 MMBtu $6.27
TOTAL ENERGY COSTS $1,822,762
RECOMMENDED SAVINGS* $414,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$39,400
Cost:
$50,000
- - - - - - $39,400 6,290 - - -
-
kWh
-
-
kW-months/year
-
-
$
$39,400
6,290
MMBtu
-
-
$
02: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$235,000
Cost:
$20,000
- - - - - - $235,000 37,400 - - -
-
kWh
-
-
kW-months/year
-
-
$
$235,000
37,400
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$85,200
Cost:
$10,000
- - - - $85,200 - - - - - -
-
kWh
-
-
kW-months/year
$85,200
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,500
Cost:
$82,400
$21,500 526,000 - - - - - - - - $21,500
526,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.7122 DISCONNECT BALLASTS Savings:
$18,200
Cost:
$15,200
$12,600 288,000 $5,600 762 - - - - - - $12,600
288,000
kWh
$5,600
762
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,292
Cost:
$1,190
$358 8,760 - - - - - - $934 - $358
8,760
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$934
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,600
Cost:
$19,900
$10,600 259,000 - - - - - - - - $10,600
259,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,800
Cost:
-
$3,800 92,800 - - - - - - - - $3,800
92,800
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$414,992
Cost:
$198,690
$48,858 1,174,560 $5,600 762 $85,200 - $274,400 43,690 $934 - $48,858
1,174,560
kWh
$5,600
762
kW-months/year
$85,200
-
$
$274,400
43,690
MMBtu
$934
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost