IAC logo
IAC Assessment: GT0818
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0818
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Vinyl Coated Mesh Fabric
NAICS 313320 - Fabric Coating Mills
SIC 2295 - Coated Fabrics, Not Rubberized
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 50,000
Annual Production 1,170 Thousand Feet
Production Hrs. Annual 8,720
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,495 1,212,960 kWh $0.03
Electricity Demand $36,072 2,666 kW-months/year $13.53
Natural Gas $164,926 10,459 MMBtu $15.77
TOTAL ENERGY COSTS $242,493
RECOMMENDED SAVINGS* $183,603 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,076
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,499
Cost:
$4,242
$4,037 118,033 $2,462 162 - - - - $4,037
118,033
kWh
$2,462
162
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$577
Cost:
$356
$358 10,464 $219 14 - - - - $358
10,464
kWh
$219
14
kW-months/year
-
-
MMBtu
-
-
$
03: 2.5113 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING Savings:
$71,569
Cost:
$250,000
$(-54,141) (-1,583,080) $(-39,216) (-2,580) $164,926 10,459 - - $(-54,141)
(-1,583,080)
kWh
$(-39,216)
(-2,580)
kW-months/year
$164,926
10,459
MMBtu
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$46,640
Cost:
$7,200
- - - - - - $46,640 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$46,640
-
$
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$37,004
Cost:
$3,300
- - - - $37,004 2,342 - - -
-
kWh
-
-
kW-months/year
$37,004
2,342
MMBtu
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$21,314
Cost:
$7,500
- - - - $21,314 1,349 - - -
-
kWh
-
-
kW-months/year
$21,314
1,349
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$183,603
Cost:
$272,598
$(-49,746) (-1,454,583) $(-36,535) (-2,404) $223,244 14,150 $46,640 - $(-49,746)
(-1,454,583)
kWh
$(-36,535)
(-2,404)
kW-months/year
$223,244
14,150
MMBtu
$46,640
-
$
TOTAL IMPLEMENTED Savings:
$7,076
Cost:
$4,598
$4,395 128,497 $2,681 176 - - - - $4,395
128,497
kWh
$2,681
176
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $