IAC logo
IAC Assessment: GT0825
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0825
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Woolen and Worsted Finishing
NAICS 313210 - Broadwoven Fabric Mills
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 665,000
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,399,921 21,466,498 kWh $0.07
Natural Gas $361,104 35,081 MMBtu $10.29
Fuel Oil #6 $847,096 135,861 MMBtu $6.24
TOTAL ENERGY COSTS $2,608,121
RECOMMENDED SAVINGS* $205,667 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Ancillary Material Cost Electricity Usage Fuel Oil #6 Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,828
Cost:
-
- - - - $14,828 - - - -
-
kWh
-
-
MMBtu
$14,828
-
$
-
-
$
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$95,828
Cost:
$140,000
- - $95,828 8,873 - - - - -
-
kWh
$95,828
8,873
MMBtu
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,150
Cost:
$4,150
$3,150 57,897 - - - - - - $3,150
57,897
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$13,107
Cost:
$1,500
$13,107 240,935 - - - - - - $13,107
240,935
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$78,754
Cost:
$182,180
$72,600 1,334,551 - - - - $6,154 - $72,600
1,334,551
kWh
-
-
MMBtu
-
-
$
$6,154
-
$
TOTAL RECOMMENDED Savings:
$205,667
Cost:
$327,830
$88,857 1,633,383 $95,828 8,873 $14,828 - $6,154 - $88,857
1,633,383
kWh
$95,828
8,873
MMBtu
$14,828
-
$
$6,154
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Fuel Oil #6 Administrative Changes Ancillary Material Cost Electricity Usage Fuel Oil #6 Administrative Changes Ancillary Material Cost