Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2007
Principal Product Plastic Film
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 300,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 3,840
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $384,130 7,693,942 kWh $0.05
Electricity Demand $148,543 9,696 kW-months/year $15.32
Electricity Fees $36,902 - $ -
Natural Gas $82,473 8,849 MMBtu $9.32
TOTAL ENERGY COSTS $652,048
RECOMMENDED SAVINGS* $42,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,540
Cost:
$2,000
$15,540 361,800 - - $15,540
361,800
kWh
-
-
kW-months/year
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$6,900
Cost:
-
$6,900 161,500 - - $6,900
161,500
kWh
-
-
kW-months/year
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$4,810
Cost:
-
$4,810 112,560 - - $4,810
112,560
kWh
-
-
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,720
Cost:
-
$2,720 63,600 - - $2,720
63,600
kWh
-
-
kW-months/year
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$903
Cost:
$2,882
$466 9,520 $437 29 $466
9,520
kWh
$437
29
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,752
Cost:
$24,975
$6,060 124,000 $5,692 372 $6,060
124,000
kWh
$5,692
372
kW-months/year
TOTAL RECOMMENDED Savings:
$42,625
Cost:
$29,857
$36,496 832,980 $6,129 401 $36,496
832,980
kWh
$6,129
401
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand