IAC Assessment: GT0849
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0849
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2008
Principal Product Kraft Paper
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $100,000,000-$500,000,000
# of Employees 273
Plant Area (Sq.Ft.) 3,000,000
Annual Production 315,000 Tons
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,084,356 110,983,405 kWh $0.04
Natural Gas $4,490,760 6,195,838 MMBtu $0.72
TOTAL ENERGY COSTS $8,575,116
RECOMMENDED SAVINGS* $887,973 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $292,310
#|Description Savings
Cost
Status Electricity Usage Wood Other Energy Water Consumption Electricity Usage Wood Other Energy Water Consumption
$ kWh $ MMBtu $ MMBtu $ Tgal
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$98,980
Cost:
-
- - - - $98,980 - - - -
-
kWh
-
-
MMBtu
$98,980
-
MMBtu
-
-
Tgal
02: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT Savings:
$175,600
Cost:
$100,000
- - $175,600 395,405 - - - - -
-
kWh
$175,600
395,405
MMBtu
-
-
MMBtu
-
-
Tgal
03: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$57,260
Cost:
-
$3,256 59,200 - - $34,466 23,575 $19,538 - $3,256
59,200
kWh
-
-
MMBtu
$34,466
23,575
MMBtu
$19,538
-
Tgal
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$292,310
Cost:
$18,200
$15,220 276,700 - - $185,770 83,680 $91,320 - $15,220
276,700
kWh
-
-
MMBtu
$185,770
83,680
MMBtu
$91,320
-
Tgal
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$35,083
Cost:
$40,800
- - - - $35,083 15,803 - - -
-
kWh
-
-
MMBtu
$35,083
15,803
MMBtu
-
-
Tgal
06: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$228,740
Cost:
$900,000
$1,070,900 19,471,200 - - $(-842,160) (-379,350) - - $1,070,900
19,471,200
kWh
-
-
MMBtu
$(-842,160)
(-379,350)
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$887,973
Cost:
$1,059,000
$1,089,376 19,807,100 $175,600 395,405 $(-487,861) (-256,292) $110,858 - $1,089,376
19,807,100
kWh
$175,600
395,405
MMBtu
$(-487,861)
(-256,292)
MMBtu
$110,858
-
Tgal
TOTAL IMPLEMENTED Savings:
$292,310
Cost:
$18,200
$15,220 276,700 - - $185,770 83,680 $91,320 - $15,220
276,700
kWh
-
-
MMBtu
$185,770
83,680
MMBtu
$91,320
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ Tgal
Electricity Usage Wood Other Energy Water Consumption Electricity Usage Wood Other Energy Water Consumption