IAC Assessment: GT0850
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0850
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2008
Principal Product Contact Lenses
NAICS 339115 - Ophthalmic Goods Manufacturing
SIC 3851 - Ophthalmic Goods
Sales $100,000,000-$500,000,000
# of Employees 220
Plant Area (Sq.Ft.) 110,000
Annual Production 62,353,000 Pieces
Production Hrs. Annual 8,520
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $449,220 9,124,532 kWh $0.05
Electricity Demand $180,216 14,452 kW-months/year $12.47
Natural Gas $63,901 6,474 MMBtu $9.87
TOTAL ENERGY COSTS $693,337
RECOMMENDED SAVINGS* $107,687 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,172
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$2,910
Cost:
-
- - - - $2,910 - - - - - -
-
kWh
-
-
kW-months/year
$2,910
-
$
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,172
Cost:
$10,000
$8,172 148,577 - - - - - - - - $8,172
148,577
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,480
Cost:
-
$4,480 81,515 - - - - - - - - $4,480
81,515
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,447
Cost:
$4,800
$2,447 44,487 - - - - - - - - $2,447
44,487
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$23,045
Cost:
$29,000
- - - - - - $23,045 2,403 - - -
-
kWh
-
-
kW-months/year
-
-
$
$23,045
2,403
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,700
Cost:
$20,540
$28,700 521,753 - - - - - - - - $28,700
521,753
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$5,170
Cost:
$12,600
$5,170 93,957 - - - - - - - - $5,170
93,957
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,237
Cost:
$7,000
$4,294 85,966 $943 76 - - - - - - $4,294
85,966
kWh
$943
76
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,982
Cost:
$40,482
$19,622 416,602 $6,360 510 - - - - - - $19,622
416,602
kWh
$6,360
510
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,544
Cost:
$1,580
$647 11,770 - - - - - - $897 - $647
11,770
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$897
-
$
TOTAL RECOMMENDED Savings:
$107,687
Cost:
$126,002
$73,532 1,404,627 $7,303 586 $2,910 - $23,045 2,403 $897 - $73,532
1,404,627
kWh
$7,303
586
kW-months/year
$2,910
-
$
$23,045
2,403
MMBtu
$897
-
$
TOTAL IMPLEMENTED Savings:
$8,172
Cost:
$10,000
$8,172 148,577 - - - - - - - - $8,172
148,577
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost