IAC logo
IAC Assessment: GT0870
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0870
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2009
Principal Product 100% Cotton Yarn
NAICS 313110 - Fiber, Yarn, and Thread Mills
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 198,000
Annual Production 42,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,915,366 27,362,370 kWh $0.07
Electricity Demand $137,131 43,943 kW-months/year $3.12
Electricity Fees $118,094 - $ -
TOTAL ENERGY COSTS $2,170,591
RECOMMENDED SAVINGS* $103,666 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,300
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$625
Cost:
-
- - $625 - -
-
kWh
$625
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,570
Cost:
$1,000
$4,570 65,260 - - $4,570
65,260
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,245
Cost:
$20,050
$9,245 132,075 - - $9,245
132,075
kWh
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,810
Cost:
$620
$5,810 83,003 - - $5,810
83,003
kWh
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$43,210
Cost:
-
$43,210 617,350 - - $43,210
617,350
kWh
-
-
$
06: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES Savings:
$1,500
Cost:
$6,399
$1,500 21,455 - - $1,500
21,455
kWh
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$33,910
Cost:
$45,000
$33,910 484,400 - - $33,910
484,400
kWh
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,796
Cost:
$7,656
$4,796 68,520 - - $4,796
68,520
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$103,666
Cost:
$80,725
$103,041 1,472,063 $625 - $103,041
1,472,063
kWh
$625
-
$
TOTAL IMPLEMENTED Savings:
$94,300
Cost:
$72,069
$93,675 1,338,283 $625 - $93,675
1,338,283
kWh
$625
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees