IAC logo
IAC Assessment: GT0871
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0871
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2010
Principal Product Specialty Chemicals
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 33
Plant Area (Sq.Ft.) 1,045,440
Annual Production 132,100,000 Pounds
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $348,721 3,978,457 kWh $0.09
Electricity Fees $29,247 - $ -
Natural Gas $602,867 62,826 MMBtu $9.60
TOTAL ENERGY COSTS $980,835
RECOMMENDED SAVINGS* $216,901 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,541
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,860
Cost:
$768
- - $2,860 307 -
-
kWh
$2,860
307
MMBtu
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$20,114
Cost:
$23,200
- - $20,114 2,158 -
-
kWh
$20,114
2,158
MMBtu
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$40,118
Cost:
$23,620
- - $40,118 4,304 -
-
kWh
$40,118
4,304
MMBtu
04: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK Savings:
$119,576
Cost:
$25,000
- - $119,576 12,830 -
-
kWh
$119,576
12,830
MMBtu
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,635
Cost:
$22,000
$3,635 43,800 - - $3,635
43,800
kWh
-
-
MMBtu
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$16,535
Cost:
$11,000
$16,535 199,225 - - $16,535
199,225
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,563
Cost:
$17,696
$4,563 54,976 - - $4,563
54,976
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,500
Cost:
$12,000
$9,500 114,456 - - $9,500
114,456
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$216,901
Cost:
$135,284
$34,233 412,457 $182,668 19,599 $34,233
412,457
kWh
$182,668
19,599
MMBtu
TOTAL IMPLEMENTED Savings:
$47,541
Cost:
$42,084
$4,563 54,976 $42,978 4,611 $4,563
54,976
kWh
$42,978
4,611
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas