Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2012 |
Principal Product | Trienol |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 15,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $195,448 | 4,566,135 | kWh | $0.04 |
Electricity Demand | $83,314 | 8,291 | kW-months/year | $10.05 |
Electricity Fees | $20,316 | - | $ | - |
Natural Gas | $182,647 | 29,795 | MMBtu | $6.13 |
TOTAL ENERGY COSTS | $481,725 | |||
RECOMMENDED SAVINGS* | $122,501 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $5,045 Cost: - |
- | - | - | - | $6,545 | 1,066 | $(-1,500) | - |
- - kWh |
- - kW-months/year |
$6,545 1,066 MMBtu |
$(-1,500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $235 Cost: $270 |
$235 | 4,198 | - | - | - | - | - | - |
$235 4,198 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $656 Cost: $1,300 |
$656 | 11,700 | - | - | - | - | - | - |
$656 11,700 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $5,680 Cost: $7,500 |
- | - | - | - | $5,680 | 925 | - | - |
- - kWh |
- - kW-months/year |
$5,680 925 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,887 Cost: $3,466 |
$8,887 | 158,415 | - | - | - | - | - | - |
$8,887 158,415 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $11,820 Cost: $11,820 |
- | - | - | - | $11,820 | 1,925 | - | - |
- - kWh |
- - kW-months/year |
$11,820 1,925 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $20,940 Cost: $78,000 |
- | - | - | - | $20,940 | 3,410 | - | - |
- - kWh |
- - kW-months/year |
$20,940 3,410 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $65,080 Cost: $150,000 |
$41,650 | 742,480 | $23,430 | 2,004 | - | - | - | - |
$41,650 742,480 kWh |
$23,430 2,004 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,158 Cost: $32,620 |
$3,234 | 57,641 | $924 | 79 | - | - | - | - |
$3,234 57,641 kWh |
$924 79 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $122,501 Cost: $284,976 |
$54,662 | 974,434 | $24,354 | 2,083 | $44,985 | 7,326 | $(-1,500) | - | $54,662 974,434 kWh |
$24,354 2,083 kW-months/year |
$44,985 7,326 MMBtu |
$(-1,500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |