IAC logo
IAC Assessment: GT0894
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0894
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2012
Principal Product Trienol
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 200,000
Annual Production 15,000 Pounds
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $195,448 4,566,135 kWh $0.04
Electricity Demand $83,314 8,291 kW-months/year $10.05
Electricity Fees $20,316 - $ -
Natural Gas $182,647 29,795 MMBtu $6.13
TOTAL ENERGY COSTS $481,725
RECOMMENDED SAVINGS* $122,501 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$5,045
Cost:
-
- - - - $6,545 1,066 $(-1,500) - -
-
kWh
-
-
kW-months/year
$6,545
1,066
MMBtu
$(-1,500)
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$235
Cost:
$270
$235 4,198 - - - - - - $235
4,198
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$656
Cost:
$1,300
$656 11,700 - - - - - - $656
11,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$5,680
Cost:
$7,500
- - - - $5,680 925 - - -
-
kWh
-
-
kW-months/year
$5,680
925
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,887
Cost:
$3,466
$8,887 158,415 - - - - - - $8,887
158,415
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$11,820
Cost:
$11,820
- - - - $11,820 1,925 - - -
-
kWh
-
-
kW-months/year
$11,820
1,925
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$20,940
Cost:
$78,000
- - - - $20,940 3,410 - - -
-
kWh
-
-
kW-months/year
$20,940
3,410
MMBtu
-
-
$
08: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$65,080
Cost:
$150,000
$41,650 742,480 $23,430 2,004 - - - - $41,650
742,480
kWh
$23,430
2,004
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,158
Cost:
$32,620
$3,234 57,641 $924 79 - - - - $3,234
57,641
kWh
$924
79
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$122,501
Cost:
$284,976
$54,662 974,434 $24,354 2,083 $44,985 7,326 $(-1,500) - $54,662
974,434
kWh
$24,354
2,083
kW-months/year
$44,985
7,326
MMBtu
$(-1,500)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost