IAC logo
IAC Assessment: GT0914
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0914
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2018
Principal Product Water/Wastewater Treatment
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $50,000,000-$100,000,000
# of Employees 20
Plant Area (Sq.Ft.) 145,200
Annual Production 9,598,985,000 Units
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,488,104 20,207,565 kWh $0.07
TOTAL ENERGY COSTS $1,488,104
RECOMMENDED SAVINGS* $139,232 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,840
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$56,321
Cost:
$400
$56,321 761,095 - - $56,321
761,095
kWh
-
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$18,164
Cost:
$400
$18,164 245,456 - - $18,164
245,456
kWh
-
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$11,239
Cost:
$400
$11,239 151,876 - - $11,239
151,876
kWh
-
-
$
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$8,805
Cost:
$400
$8,805 118,985 - - $8,805
118,985
kWh
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,028
Cost:
$800
- - $2,028 - -
-
kWh
$2,028
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$42,676
Cost:
$26,357
$42,676 609,661 - - $42,676
609,661
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$139,232
Cost:
$28,757
$137,204 1,887,073 $2,028 - $137,204
1,887,073
kWh
$2,028
-
$
TOTAL IMPLEMENTED Savings:
$60,840
Cost:
$26,757
$60,840 855,117 - - $60,840
855,117
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees