IAC logo
IAC Assessment: GT0962
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0962
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2023
Principal Product Outerwear 100% Cotton Yarn
NAICS 313110 - Fiber, Yarn, and Thread Mills
SIC 2299 - Textile Goods, Nec
Sales $50,000,000-$100,000,000
# of Employees 107
Plant Area (Sq.Ft.) 365,000
Annual Production 60,952,720 Pounds
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,375,054 57,657,681 kWh $0.08
TOTAL ENERGY COSTS $4,375,054
RECOMMENDED SAVINGS* $241,884 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes
$ kWh $ $ $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$5,691
Cost:
$200
- - - - $5,691 - -
-
kWh
-
-
$
$5,691
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$30,443
Cost:
$1,850
$33,343 438,729 $(-2,900) - - - $33,343
438,729
kWh
$(-2,900)
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,943
Cost:
$800
$9,943 130,829 - - - - $9,943
130,829
kWh
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,117
Cost:
$13,039
$12,117 159,432 - - - - $12,117
159,432
kWh
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,615
Cost:
$35,774
$14,615 192,300 - - - - $14,615
192,300
kWh
-
-
$
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$169,075
Cost:
$2,808,032
$169,075 2,228,201 - - - - $169,075
2,228,201
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$241,884
Cost:
$2,859,695
$239,093 3,149,491 $(-2,900) - $5,691 - $239,093
3,149,491
kWh
$(-2,900)
-
$
$5,691
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes