IAC logo
IAC Assessment: HO0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1991
Principal Product BOLTS AND SCREWS
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 0
Annual Production 7,000,000 Pounds
Production Hrs. Annual 2,825
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,221 1,165,885 kWh $0.14
Natural Gas $5,994 1,030 MMBtu $5.82
Fuel Oil #2 $15,600 1,820 MMBtu $8.57
TOTAL ENERGY COSTS $186,815
RECOMMENDED SAVINGS* $10,396 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,070
Cost:
$1,021
$2,290 21,102 - - $(-220) - $2,290
21,102
kWh
-
-
MMBtu
$(-220)
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,063
Cost:
$667
$1,063 7,620 - - - - $1,063
7,620
kWh
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$904
Cost:
$800
- - $1,404 164 $(-500) - -
-
kWh
$1,404
164
MMBtu
$(-500)
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,695
Cost:
-
$2,695 19,050 - - - - $2,695
19,050
kWh
-
-
MMBtu
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$714
Cost:
$50
- - $714 83 - - -
-
kWh
$714
83
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,950
Cost:
$1,000
$2,950 20,809 - - - - $2,950
20,809
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,396
Cost:
$3,538
$8,998 68,581 $2,118 247 $(-720) - $8,998
68,581
kWh
$2,118
247
MMBtu
$(-720)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes