Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 1991 |
Principal Product | BRASS FITTINGS |
NAICS | n/a |
SIC | 3451 - Screw Machine Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,794 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $396,872 | 3,208,089 | kWh | $0.12 |
Natural Gas | $24,465 | 4,275 | MMBtu | $5.72 |
Fuel Oil #2 | $40,000 | 7,000 | MMBtu | $5.71 |
TOTAL ENERGY COSTS | $461,337 | |||
RECOMMENDED SAVINGS* | $244,257 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $244,257 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $631 Cost: $1,032 |
$694 | 5,569 | - | - | - | - | $(-63) | - |
$694 5,569 kWh |
- - MMBtu |
- - MMBtu |
$(-63) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,973 Cost: $742 |
$2,973 | 24,033 | - | - | - | - | - | - |
$2,973 24,033 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,555 Cost: - |
$6,920 | 55,979 | $(-1,365) | (-239) | - | - | - | - |
$6,920 55,979 kWh |
$(-1,365) (-239) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $235,098 Cost: - |
$237,285 | 1,917,937 | - | - | $40,000 | 7,000 | $(-42,187) | - |
$237,285 1,917,937 kWh |
- - MMBtu |
$40,000 7,000 MMBtu |
$(-42,187) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $244,257 Cost: $1,774 |
$247,872 | 2,003,518 | $(-1,365) | (-239) | $40,000 | 7,000 | $(-42,250) | - | $247,872 2,003,518 kWh |
$(-1,365) (-239) MMBtu |
$40,000 7,000 MMBtu |
$(-42,250) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $244,257 Cost: $1,774 |
$247,872 | 2,003,518 | $(-1,365) | (-239) | $40,000 | 7,000 | $(-42,250) | - | $247,872 2,003,518 kWh |
$(-1,365) (-239) MMBtu |
$40,000 7,000 MMBtu |
$(-42,250) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes |