IAC logo
IAC Assessment: HO0013
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0013
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1992
Principal Product INJECTABLE DRUGS
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 0
Annual Production 54,000,000 Pieces
Production Hrs. Annual 4,680
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $336,698 3,012,896 kWh $0.11
Fuel Oil #2 $114,410 17,892 MMBtu $6.39
TOTAL ENERGY COSTS $451,108
RECOMMENDED SAVINGS* $31,051 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,370
Cost:
$2,844
$2,518 22,567 - - - - $(-148) - $2,518
22,567
kWh
-
-
MMBtu
-
-
MMBtu
$(-148)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,706
Cost:
$1,831
$1,706 15,240 - - - - - - $1,706
15,240
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,707
Cost:
$4,148
$3,707 33,118 - - - - - - $3,707
33,118
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$7,008
Cost:
$8,025
$7,008 62,720 - - - - - - $7,008
62,720
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$8,130
Cost:
$8,025
- - $(-73,042) (-12,703) $81,172 12,703 - - -
-
kWh
$(-73,042)
(-12,703)
MMBtu
$81,172
12,703
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,130
Cost:
-
- - - - $8,130 - - - -
-
kWh
-
-
MMBtu
$8,130
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$31,051
Cost:
$24,873
$14,939 133,645 $(-73,042) (-12,703) $89,302 12,703 $(-148) - $14,939
133,645
kWh
$(-73,042)
(-12,703)
MMBtu
$89,302
12,703
MMBtu
$(-148)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes