Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1992
Principal Product PIN CONNECTORS
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 400,000 Pounds
Production Hrs. Annual 2,375
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,360 932,591 kWh $0.16
Fuel Oil #2 $17,923 2,190 MMBtu $8.18
TOTAL ENERGY COSTS $166,283
RECOMMENDED SAVINGS* $9,785 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,080
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,609
Cost:
$417
$1,761 11,137 - - $(-152) - $1,761
11,137
kWh
-
-
MMBtu
$(-152)
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$724
Cost:
$550
$724 4,689 - - - - $724
4,689
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$946
Cost:
$90
$946 5,862 - - - - $946
5,862
kWh
-
-
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,014
Cost:
$200
$3,014 - - - - - $3,014
-
kWh
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,698
Cost:
$500
$1,698 10,551 - - - - $1,698
10,551
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,525
Cost:
$1,721
$1,525 9,672 - - - - $1,525
9,672
kWh
-
-
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$269
Cost:
$202
- - $269 33 - - -
-
kWh
$269
33
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,785
Cost:
$3,680
$9,668 41,911 $269 33 $(-152) - $9,668
41,911
kWh
$269
33
MMBtu
$(-152)
-
$
TOTAL IMPLEMENTED Savings:
$4,080
Cost:
$2,228
$4,232 26,671 - - $(-152) - $4,232
26,671
kWh
-
-
MMBtu
$(-152)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes