IAC logo
IAC Assessment: HO0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1992
Principal Product CUSTOM METAL FABRICATION
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 4,000 Pieces
Production Hrs. Annual 2,125
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $329,004 2,351,114 kWh $0.14
Fuel Oil #2 $14,287 1,958 MMBtu $7.30
TOTAL ENERGY COSTS $343,291
RECOMMENDED SAVINGS* $8,118 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,820
Cost:
$8,205
$2,125 15,240 - - $(-305) - $2,125
15,240
kWh
-
-
MMBtu
$(-305)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,420
Cost:
$702
$1,420 10,258 - - - - $1,420
10,258
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$194
Cost:
$193
$194 1,465 - - - - $194
1,465
kWh
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,237
Cost:
$350
$1,116 7,913 $121 20 - - $1,116
7,913
kWh
$121
20
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,447
Cost:
$1,200
$2,014 14,361 $1,433 240 - - $2,014
14,361
kWh
$1,433
240
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,118
Cost:
$10,650
$6,869 49,237 $1,554 260 $(-305) - $6,869
49,237
kWh
$1,554
260
MMBtu
$(-305)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes