IAC logo
IAC Assessment: HO0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1993
Principal Product Steel Forgings
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 640,000
Annual Production 0 Units
Production Hrs. Annual 6,400
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $651,696 3,434,056 kWh $0.19
Natural Gas $314,975 108,294 MMBtu $2.91
Fuel Oil #2 $78,949 16,663 MMBtu $4.74
TOTAL ENERGY COSTS $1,045,620
RECOMMENDED SAVINGS* $13,307 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,292
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,129
Cost:
$1,598
$2,129 20,809 - - $2,129
20,809
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$987
Cost:
$2,312
$987 9,672 - - $987
9,672
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,397
Cost:
$4,133
$1,397 13,775 - - $1,397
13,775
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,387
Cost:
$1,000
$1,387 13,482 - - $1,387
13,482
kWh
-
-
MMBtu
05: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION Savings:
$1,899
Cost:
$200
- - $1,899 653 -
-
kWh
$1,899
653
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$5,508
Cost:
-
$5,508 53,927 - - $5,508
53,927
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,307
Cost:
$9,243
$11,408 111,665 $1,899 653 $11,408
111,665
kWh
$1,899
653
MMBtu
TOTAL IMPLEMENTED Savings:
$8,292
Cost:
$5,133
$8,292 81,184 - - $8,292
81,184
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas