IAC Assessment: HO0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1993
Principal Product Steel Shelves and lockers
NAICS n/a
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 250,000
Annual Production 20,000 Tons
Production Hrs. Annual 4,888
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $416,077 4,564,771 kWh $0.09
Natural Gas $160,172 46,505 MMBtu $3.44
TOTAL ENERGY COSTS $576,249
RECOMMENDED SAVINGS* $190,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,210
Cost:
$3,334
$3,210 35,170 - - - - $3,210
35,170
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,051
Cost:
$3,337
$1,051 11,430 - - - - $1,051
11,430
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$740
Cost:
$1,134
$740 8,206 - - - - $740
8,206
kWh
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$130
Cost:
$112
- - $130 38 - - -
-
kWh
$130
38
MMBtu
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$185,214
Cost:
$900,000
$356,605 3,911,489 $(-85,309) (-24,799) $(-86,082) - $356,605
3,911,489
kWh
$(-85,309)
(-24,799)
MMBtu
$(-86,082)
-
$
TOTAL RECOMMENDED Savings:
$190,345
Cost:
$907,917
$361,606 3,966,295 $(-85,179) (-24,761) $(-86,082) - $361,606
3,966,295
kWh
$(-85,179)
(-24,761)
MMBtu
$(-86,082)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes