IAC logo
IAC Assessment: HO0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1994
Principal Product Bottles
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 30,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,300 2,187,866 kWh $0.09
Natural Gas $21,132 3,432 MMBtu $6.16
TOTAL ENERGY COSTS $214,432
RECOMMENDED SAVINGS* $4,922 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,665
Cost:
$2,873
$2,665 30,188 - - $2,665
30,188
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,033
Cost:
$3,266
$1,033 11,723 - - $1,033
11,723
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$193
Cost:
$497
$193 2,052 - - $193
2,052
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$824
Cost:
$900
$824 9,379 - - $824
9,379
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$135
Cost:
$135
- - $135 22 -
-
kWh
$135
22
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$72
Cost:
-
$72 879 - - $72
879
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$4,922
Cost:
$7,671
$4,787 54,221 $135 22 $4,787
54,221
kWh
$135
22
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost