IAC Assessment: HO0077
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0077
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1994
Principal Product Reagents for Medical Applications
NAICS n/a
SIC 2835 - Diagnostic Substances
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 250,000
Annual Production 0 Units
Production Hrs. Annual 2,350
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $577,378 6,458,382 kWh $0.09
Natural Gas $10,433 1,861 MMBtu $5.61
Fuel Oil #2 $103,580 25,796 MMBtu $4.02
TOTAL ENERGY COSTS $691,391
RECOMMENDED SAVINGS* $309,403 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,225
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,135
Cost:
$18,875
$8,135 91,442 - - - - $8,135
91,442
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,374
Cost:
$9,484
$2,374 26,671 - - - - $2,374
26,671
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$716
Cost:
$2,035
$716 7,913 - - - - $716
7,913
kWh
-
-
MMBtu
-
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$76,210
Cost:
-
$76,210 852,579 - - - - $76,210
852,579
kWh
-
-
MMBtu
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$221,968
Cost:
$1,440,000
$438,169 4,901,524 $(-108,331) (-26,948) $(-107,870) - $438,169
4,901,524
kWh
$(-108,331)
(-26,948)
MMBtu
$(-107,870)
-
$
TOTAL RECOMMENDED Savings:
$309,403
Cost:
$1,470,394
$525,604 5,880,129 $(-108,331) (-26,948) $(-107,870) - $525,604
5,880,129
kWh
$(-108,331)
(-26,948)
MMBtu
$(-107,870)
-
$
TOTAL IMPLEMENTED Savings:
$11,225
Cost:
$30,394
$11,225 126,026 - - - - $11,225
126,026
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes