IAC Assessment: HO0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1994
Principal Product Metallic Powders
NAICS n/a
SIC 3399 - Primary Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 87
Plant Area (Sq.Ft.) 109,000
Annual Production 8,200,000 Pounds
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $543,958 6,256,741 kWh $0.09
Fuel Oil #4 $75,550 15,921 MMBtu $4.75
TOTAL ENERGY COSTS $619,508
RECOMMENDED SAVINGS* $277,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,941
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Fuel Oil #4 Electricity Usage Fuel Oil #2 Fuel Oil #4
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,503
Cost:
$1,976
$2,503 28,722 - - - - $2,503
28,722
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,842
Cost:
$4,383
$1,842 21,102 - - - - $1,842
21,102
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,282
Cost:
$2,977
$2,282 26,377 - - - - $2,282
26,377
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,314
Cost:
$1,500
$7,314 84,115 - - - - $7,314
84,115
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$263,543
Cost:
$1,260,000
$440,040 5,061,548 $(-221,706) (-46,675) $45,209 9,518 $440,040
5,061,548
kWh
$(-221,706)
(-46,675)
MMBtu
$45,209
9,518
MMBtu
TOTAL RECOMMENDED Savings:
$277,484
Cost:
$1,270,836
$453,981 5,221,864 $(-221,706) (-46,675) $45,209 9,518 $453,981
5,221,864
kWh
$(-221,706)
(-46,675)
MMBtu
$45,209
9,518
MMBtu
TOTAL IMPLEMENTED Savings:
$13,941
Cost:
$10,836
$13,941 160,316 - - - - $13,941
160,316
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Fuel Oil #2 Fuel Oil #4 Electricity Usage Fuel Oil #2 Fuel Oil #4