IAC logo
IAC Assessment: HO0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1995
Principal Product Toilet Partitions
NAICS n/a
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $5,000,000-$10,000,000
# of Employees 92
Plant Area (Sq.Ft.) 60,000
Annual Production 132,000 Pieces
Production Hrs. Annual 2,210
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,949 499,707 kWh $0.07
Natural Gas $73,915 9,189 MMBtu $8.04
TOTAL ENERGY COSTS $113,752
RECOMMENDED SAVINGS* $37,552 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Water Disposal Administrative Changes Electricity Usage Water Disposal Administrative Changes
$ kWh $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,127
Cost:
$3,978
$2,127 32,239 - - - - $2,127
32,239
kWh
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$419
Cost:
$1,555
$419 6,448 - - - - $419
6,448
kWh
-
-
Tgal
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$97
Cost:
$412
$97 1,465 - - - - $97
1,465
kWh
-
-
Tgal
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$447
Cost:
$600
$447 5,862 - - - - $447
5,862
kWh
-
-
Tgal
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$175
Cost:
$390
$175 2,638 - - - - $175
2,638
kWh
-
-
Tgal
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,910
Cost:
$300
$1,910 29,015 - - - - $1,910
29,015
kWh
-
-
Tgal
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$31,627
Cost:
$50,000
- - - - $31,627 - -
-
kWh
-
-
Tgal
$31,627
-
$
08: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$750
Cost:
$2,500
$(-46) (-586) $796 397,800 - - $(-46)
(-586)
kWh
$796
397,800
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$37,552
Cost:
$59,735
$5,129 77,081 $796 397,800 $31,627 - $5,129
77,081
kWh
$796
397,800
Tgal
$31,627
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ Tgal $ $
Electricity Usage Water Disposal Administrative Changes Electricity Usage Water Disposal Administrative Changes