IAC logo
IAC Assessment: HO0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1995
Principal Product Gears
NAICS n/a
SIC 3566 - Speed Changers, Drives, And Gears
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 55,000
Annual Production 84,000 Pounds
Production Hrs. Annual 4,264
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,396 1,216,589 kWh $0.15
Fuel Oil #2 $18,294 2,989 MMBtu $6.12
TOTAL ENERGY COSTS $197,690
RECOMMENDED SAVINGS* $18,834 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,845
Cost:
$6,502
$12,845 87,339 - - $12,845
87,339
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,841
Cost:
$4,231
$3,841 26,084 - - $3,841
26,084
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$342
Cost:
$450
$342 2,345 - - $342
2,345
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$964
Cost:
$400
$964 6,448 - - $964
6,448
kWh
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$842
Cost:
$1,500
$1,024 7,034 $(-182) (-30) $1,024
7,034
kWh
$(-182)
(-30)
MMBtu
TOTAL RECOMMENDED Savings:
$18,834
Cost:
$13,083
$19,016 129,250 $(-182) (-30) $19,016
129,250
kWh
$(-182)
(-30)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2