IAC Assessment: HO0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1995
Principal Product Epoxies
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 20,000
Annual Production 3,000 Thousand Gallons
Production Hrs. Annual 4,732
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,780 172,333 kWh $0.18
Fuel Oil #2 $7,177 906 MMBtu $7.92
TOTAL ENERGY COSTS $38,957
RECOMMENDED SAVINGS* $4,227 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,227
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,052
Cost:
$4,538
$3,052 16,706 - - $3,052
16,706
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$401
Cost:
$286
$401 2,052 - - $401
2,052
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$89
Cost:
$60
$89 586 - - $89
586
kWh
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$81
Cost:
$30
- - $81 10 -
-
kWh
$81
10
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$604
Cost:
$400
$604 3,224 - - $604
3,224
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$4,227
Cost:
$5,314
$4,146 22,568 $81 10 $4,146
22,568
kWh
$81
10
MMBtu
TOTAL IMPLEMENTED Savings:
$4,227
Cost:
$5,314
$4,146 22,568 $81 10 $4,146
22,568
kWh
$81
10
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2