IAC logo
IAC Assessment: HO0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1996
Principal Product Automotive Accessories
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 90,000
Annual Production 0 Units
Production Hrs. Annual 2,210
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,797 412,954 kWh $0.28
Electricity Fees $4,697 - $ -
TOTAL ENERGY COSTS $121,494
RECOMMENDED SAVINGS* $25,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,852
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,672
Cost:
$2,866
$5,672 19,343 - - $5,672
19,343
kWh
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,280
Cost:
$6,484
$6,280 21,395 - - $6,280
21,395
kWh
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,975
Cost:
$3,110
$2,975 10,258 - - $2,975
10,258
kWh
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,573
Cost:
$400
$1,573 5,275 - - $1,573
5,275
kWh
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,352
Cost:
$180
$3,352 11,430 - - $3,352
11,430
kWh
-
-
lb
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$5,430
Cost:
-
- - $5,430 - -
-
kWh
$5,430
-
lb
TOTAL RECOMMENDED Savings:
$25,282
Cost:
$13,040
$19,852 67,701 $5,430 - $19,852
67,701
kWh
$5,430
-
lb
TOTAL IMPLEMENTED Savings:
$19,852
Cost:
$13,040
$19,852 67,701 - - $19,852
67,701
kWh
-
-
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)