IAC Assessment: HO0136
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0136
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1996
Principal Product Polyester Fiber Fill
NAICS n/a
SIC 2282 - Throwing And Winding Mills
Sales $1,000,000-$5,000,000
# of Employees 16
Plant Area (Sq.Ft.) 24,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,114 240,328 kWh $0.06
Electricity Demand $43,055 1,906 kW-months/year $22.59
Electricity Fees $3,037 - $ -
Natural Gas $45,240 5,445 MMBtu $8.31
TOTAL ENERGY COSTS $114,446
RECOMMENDED SAVINGS* $53,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,102
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$325
Cost:
$1,302
$103 1,758 $222 11 - - - - $103
1,758
kWh
$222
11
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$211
Cost:
$905
$211 3,517 - - - - - - $211
3,517
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$96
Cost:
$200
$96 1,465 - - - - - - $96
1,465
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$47,059
Cost:
$145,000
$12,191 206,624 $39,306 1,740 $(-4,438) (-1,603) - - $12,191
206,624
kWh
$39,306
1,740
kW-months/year
$(-4,438)
(-1,603)
MMBtu
-
-
lb
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,736
Cost:
$6,500
- - - - - - $5,736 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,736
-
lb
TOTAL RECOMMENDED Savings:
$53,427
Cost:
$153,907
$12,601 213,364 $39,528 1,751 $(-4,438) (-1,603) $5,736 - $12,601
213,364
kWh
$39,528
1,751
kW-months/year
$(-4,438)
(-1,603)
MMBtu
$5,736
-
lb
TOTAL IMPLEMENTED Savings:
$53,102
Cost:
$152,605
$12,498 211,606 $39,306 1,740 $(-4,438) (-1,603) $5,736 - $12,498
211,606
kWh
$39,306
1,740
kW-months/year
$(-4,438)
(-1,603)
MMBtu
$5,736
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)